Construction of twin-tube tunnel Vijenac. Total lenght: 2,914 m (right tube) and 2,942 m (left tube), 2 traffic lanes in each tunnel tube, 9 emergency pedestrian passages between both tubes, 2 transverse links for emergency vehicles
similar projects
Avenue Mall
Croatia
Masterplan of Pula Airport
Croatia
Construction and modernization of INA petrol stations
Croatia
Left-bank levee of the Sava River
Croatia
WMC Bikarac – installation of mechanical-biological waste treatment plant, Šibenik