{"id":11674,"date":"2019-09-03T00:00:00","date_gmt":"2019-09-03T00:00:00","guid":{"rendered":"https:\/\/igh.hr\/igh-signed-the-contract-for-supervision-services-during-construction-of-the-tpp-banovici\/"},"modified":"2019-09-03T00:00:00","modified_gmt":"2019-09-03T00:00:00","slug":"igh-signed-the-contract-for-supervision-services-during-construction-of-the-tpp-banovici","status":"publish","type":"post","link":"https:\/\/www.igh.hr\/hr\/igh-signed-the-contract-for-supervision-services-during-construction-of-the-tpp-banovici\/","title":{"rendered":"IGH potpisao ugovor o nadzoru nad izgradnjom Termoelektrane Banovi\u0107i"},"content":{"rendered":"
Institut IGH, kao \u010dlan zajednice ponuditelja koju \u010dini s partnerima STEAG Energy Services GmbH i SGS Beograd d.o.o., potpisao je s Rudnicima mrkog uglja Banovi\u0107i d.d. Ugovor o nabavci usluga nadzornog organa -\u201cln\u017eenjera\u201d- nad implementacijom Ugovora o in\u017eenjeringu, nabavci i izgradnji \u2013 EPC za Termoelektranu Banovi\u0107i, blok 1-350 MW broj 1669\/15\u2033.<\/p>\n
Institut IGH anga\u017eiran je za usluge revizije projektne dokumentacije, stru\u010dni nadzor nad izvo\u0111enjem gra\u0111evinskih radova i dijelu poslova QA\/QC nad monta\u017eom \u010deli\u010dnih konstrukcija na gradili\u0161tu. Cjelokupan ugovor zasnovan je na sistemu \u201eklju\u010d u ruke\u201c, a vrijednost mu je 7,15 milijuna EUR-a za usluge iz tri grupe poslova: Usluge revizije projektne dokumentacije EPC Ugovora, Usluge nadzora nad izvo\u0111enjem radova na gradili\u0161tu i Usluge nadzora nad proizvodnjom postrojenja i opreme u radionicama te isporukom opreme za Termoelektranu Banovi\u0107i, blok 1-350 MM.<\/p>\n
Rok izvr\u0161enja ugovora je 40 mjeseci, a svrha mu je osiguravanje kvalitetnog pra\u0107enja realizacije projekta i provo\u0111enje svih kontrola i ispitivanja ugra\u0111enih materijala i opreme u postrojenje novog bloka, kako bi se postigao visoki standard i kvaliteta izvo\u0111enja radova odabranog izvo\u0111a\u010da Dongfang Electric Corporation Limited DEC Kina.<\/p>\n
Ukupna vrijednost investicije u RMU Banovi\u0107i iznosi 412,4 milijuna EUR-a.<\/p>","protected":false},"excerpt":{"rendered":"
Institut IGH as member of the Consortium, i.e. Group of Tenderers consisting of STEAG Energy Services GmbH and SGS Beograd d.o.o. and the Rudnici mrkog uglja Banovi\u0107i d.d Company \/Brown Coal Mines Banovi\u0107i JSC\/ signed the Contract for Supervision Services of the \u201eEngineer\u201c for the Implementation of the Contract on Engineering, Procurement and Construction \u2013EPC […]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/11674"}],"collection":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/comments?post=11674"}],"version-history":[{"count":0,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/11674\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/media?parent=11674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/categories?post=11674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/tags?post=11674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}